HULL TREATMENT



                                                                                      2
                                        Description                      Charges / M U.S.D.



                    - Light Scraping to remove normal sea fouling                 1.0



                    - Hard Scraping                                               1.5


                    - Scraping hull by H.P. water jet                             2.0



                    - Washing hull by fresh water                                 1.0



                    - Hand scraping for internals                                 2.5


                    - Washing down normal oil stains with chemicals               2.8



                    - Sand sweeping                                               4.8



                    - Sand blasting                                               8.5


                    - Blasting with aluminum selecate                             12



                    - Hand hammering for side shells & decks                      2.65



                    - Hand hammering for internal spaces                           5


                    - Painting per coat                                           1.0



                    - Painting per coat for internals                             2.0


          Notes
                    (١) Paints owner supply.
                    (٢) Touch up will be charged 25% extra, Min area 10% of total area.
                                                          2
                    (٣) Spot sand blasting (min area 100 m ) extra charge 25 %
                    (٤) Scaffolding :
                        * For vertical bottom and boot topping extra charge 15%
                        * For top side extra charge 20 %
                        * For boats, area above plimsoll mark extra charge 15 %
                       N.B. :
                              In case scaffolding are used for more than one job, the extra charge will be based
                              on the highest job cost.