Page 28 - Shipyards
P. 28

GENERAL SERVICES


          1- Shore Electric Power :                                U.S.D
             -  Current A.C.                                       0.3 / K.W.H
             -  Line connection and disconnection                  85 / Time

          2- Fresh Water :
             -  Supply from shore line                             5 / Ton
             -  Line connection and disconnection                  75 / Time
             -  Supply by barge                                    as per agreement

          3- Cooling Water :
             -  Supply                                                  45 / Day
             -  Line connection and disconnection                  75 / Time

          4- Ballast Water :
             -  Line connection & disconnection                    75 / Time
             -  Supply                                                  1 / Ton

          5- Compressed Air :
             -  Supply                                                  32 / Day
             -  Line connection and disconnection                  75 / Time

          6- Gas free certificate :                                100 / Each


          7- Dock Crane :                                          60 / hr (accumulated )

                 N.B. :  Calculation of hrs will be based on the sum of the actual consumed hours, the fraction of
                        one hr. in the total will be counted as one hr considering the min. hiring hours is 0.5 hr.
                        for each time.


          8- Garbage:                                              45 / Day

          9- Fire fighting arrangement :
                                                     Port Taufik Shipyard                Port Said Shipyard
             -  Fire watchmen                               100 / Day               200 / Day
             -  Equipments                                  15 / Day                30 / Day
             -  Line connection and disconnection           60/ Time                60 / Time
                   N.B.  :  Fire  Fighting  charges  will  be  for  all  days  ,the  ship  stays  in  the  yard  from  arrival  to
                          departure date ( regardless the type of work ) .
          10- Quay hiring :
                 Lay day / mt of L.O.A.                            3  U.S.D.

                 N.B. :  Quay hiring will be applicable in case of ship laying is due to owner reasons.









                                                            27