Page 28 - Shipyards
P. 28
GENERAL SERVICES
1- Shore Electric Power : U.S.D
- Current A.C. 0.3 / K.W.H
- Line connection and disconnection 85 / Time
2- Fresh Water :
- Supply from shore line 5 / Ton
- Line connection and disconnection 75 / Time
- Supply by barge as per agreement
3- Cooling Water :
- Supply 45 / Day
- Line connection and disconnection 75 / Time
4- Ballast Water :
- Line connection & disconnection 75 / Time
- Supply 1 / Ton
5- Compressed Air :
- Supply 32 / Day
- Line connection and disconnection 75 / Time
6- Gas free certificate : 100 / Each
7- Dock Crane : 60 / hr (accumulated )
N.B. : Calculation of hrs will be based on the sum of the actual consumed hours, the fraction of
one hr. in the total will be counted as one hr considering the min. hiring hours is 0.5 hr.
for each time.
8- Garbage: 45 / Day
9- Fire fighting arrangement :
Port Taufik Shipyard Port Said Shipyard
- Fire watchmen 100 / Day 200 / Day
- Equipments 15 / Day 30 / Day
- Line connection and disconnection 60/ Time 60 / Time
N.B. : Fire Fighting charges will be for all days ,the ship stays in the yard from arrival to
departure date ( regardless the type of work ) .
10- Quay hiring :
Lay day / mt of L.O.A. 3 U.S.D.
N.B. : Quay hiring will be applicable in case of ship laying is due to owner reasons.
27