Suez Canal Authority has completed its planned phase to increase the Canal permissible draft to 66 ft at January 2010.
This enables the Canal to accommodate the following percentages of the fully loaded vessels: 

 
61.2 % Of the Tanker Fleet
92.7 % Of the Bulk Carrier Fleet
100 % Of the Container Ships & Othe​r Ships​​